Panel Slab Formwork – EVODECK
The EVODECK system is a universal and lightweight element slab formwork system made of aluminum. This system is suitable for all types of ceiling such as: solid concrete, floor slab (paneled surfaces), mixed floor (concrete and masonry) and lightweight slabs.
This lightweight panel slab formwork enables effortless working from floor-level. Fast assembly and disassembly are guaranteed, accompanied by easy to handle and lightweight system components. The low individual weight of the elements (max. of 24 kg) and practical dimensions of the elements favour ergonomic work on the construction site.
The system is available with two different prop heads, the fixed head, and the drop head. Both can be mounted on all common types of props.
The fixed prop head can be used for the shuttering of the slab formwork and also serves as a support for wall areas and corners. The drop-head construction instead permits early stripping already after 2 to 5 days from the casting, always depending on the strength of the concrete. Therefore, most of the formwork equipment can be reused right away in the next concrete operation, thus on-site material requirements are significantly reduced.
This aluminium slab formwork is used for various areas of construction (residential houses, office buildings, industrial buildings, etc.) and any height and ceiling thickness can be realized.
Product-Presentation-Video Panel Slab Formwork EVODECK
Standard elements 120X150 cm
Low weight of only 24 kg
Low transport volume
Flexibility in shelling
Only 2 different prop heads
Prop heads have the same height (40 cm)
Compact stacking frames
Safe working from floor-level
Element direction can be flexibly selected
Copes well with varying structural design and geometrical requirements
Solid slab cast on site up to 40 cm (admissible load 11.7 kN/m²)
Solid slab cast on site up to 80 cm max. (admissible load 21.7 kN/m²)
Partial early stripping
Projects & References
Expansion of the Quellenhof hotel complex in St. Martin in Passeier (South Tyrol)
In St. Martin in Passeier/Meran, the 5-star sports and wellness resort Quellenhof has expanded its hotel complex by a chalet village and an exclusive lake landscape. A total of around 40,000 m³ of cubature was installed. Our EVODECK slab formwork and MAXIM wall formwork were used for the conversion.
Construction of a new Falkensteiner Family Hotel in Montafon (Vorarlberg/Austria)
A new Falkensteiner Family Hotel was built in Tschagguns (Montafon/Vorarlberg) and our EVODECK slab formwork contributed to the successful realization of this project. Around 4,000 m² of slab formwork was used. Short construction times and a high level of safety were made possible when forming the slabs thanks to the universal EVODECK element slab formwork.
Realization of the new generation of ceilings – Seiseralm (BZ)
In the heart of the Seiser Alm, at the foot of the Dolomites, the new Brunelle Seiser Alm Lodge is being built. The EVODECK system of the new generation was chosen for the realization of the ceilings. The construction company Winkler Bauteam used only 3 people to form up to 670 m² per day.
Extension of the Hotel Waldhof – Rabland near Merano (BZ)
The renovation of the Waldhof Hotel has started. Systems used for construction: MAXIM for walls and pillars, the new EVODECK element slab formwork system for 40 cm solid concrete ceilings. Many thanks to Eurobeton2000.